#103 – 13443 78 Ave, Surrey, BC V3W 0K8 info@greenpointasbestos.com | 604-593-8868
St.Paul Parish Church
Project Location:
Project Manager:
Completion Date: TBD
Consultant: N/A
About This Project:
Items containing asbestos, scheduled for removal
-
Textured ceilings (High Risk)
-
Drywall joint compound applied to drywall walls and ceiling (Moderate Risk) except textured ceilings
-
Vinyl flooring (Moderate Risk)
-
Vermiculite (High Risk)
-
Window Putty (Moderate Risk)
-
Sink Mastics (Moderate Risk)
-
Insulating Cement on Boiler Flue (Moderate Risk)
-
Masonry wall cavity (vermiculite) (High Risk)
-
Beige vinyl floor tiles (Moderate Risk)
-
Parging cement on pipe elbows (Moderate Risk)
-
Gold sink Mastics (Moderate Risk)
-
Black interior window putty (interior side) (Moderate Risk)
-
White exterior putty on all ext. windows
-
Boiler